ALL Supports & Equipment According to Hyginenic Pro

All Supplied Materials are made of Stanless Steel for manufacture area ( hangers, supports, bolts, nuts, .... )

Scope of works

 1- Air conditioning works (split DX unit).

 2- Industrial Ventilation (roof top fans).

 3- Fire-Fighting Works(

Sprinklers system-

Fire Hose cabinet

system-

CO0 and FM200 system-

Pumping room)

4- Compressed Air system (Oil free and dry air).

5- Fuel tanks, diesel Pipelines and Burner. 

 

  • Project Name:- CITRUS SORTING AND PACKING STATION

  • Owner:- Orientals for Urban Development (OUD)

  •   Consultant:- Mechanical Consultation Unit
                                     AL-Azhar university

  •   Date of implementation: (2020-2021)

  •   Location:Wady Almoulak Ismailia

OVER VIEW

Citrus sorting and packing station Wady Almoulak Al'asmaeilia
It is divided into an administrative part and an industrial part
The administrative building is designed through a system of separate air conditioning units
As for the industrial part, Ventilated by industrial ventilation
And fire networks were made divided into machine guns and fire boxes and pump rooms
And the use of CO2 system in transformer and generator rooms and fm200 in IT Rooms.

 